Scott Sampson Products, Inc.Problem 14.8 & 14.9 –

14.8 As the production planner for Scott Sampson Products, Inc., you have been given a bill of material for a bracket that is made up of a base, two springs, and four clamps. The base is assembled from one clamp and two housings. Each clamp has one handle and one casting. Each housing has two bearings and one shaft. There is no inventory on hand.a) Design a product structure noting the quantities for each item and show the low- level coding.”b) Determine the gross quantities needed of each item if you are to assemble 50 brackets.c) Compute the net quantities needed if there are 25 of the base and 100 of the clamp in stock.”

14.9 Your boss at Scott Sampson Products, Inc., has just provided you with the schedule and lead times for the bracket in Problem 14.8. The unit is to be prepared in week 10. The lead times for the components are bracket ( 1 week), base ( 1 week), spring ( 1 week), clamp ( 1 week), housing ( 2 weeks), handle ( 1 week), casting ( 3 weeks), bearing ( 1 week), and shaft ( 1 week).a) Prepare the time- phased product structure for the bracket.b) In what week do you need to start the castings?

Our Essay Format
  • Times New Roman, 12 pt
  • 1 Inch Margins
  • Double/ Single Spacing
  • 275/ 550 Words Per Page
  • MLA/ APA/ Turabian/ Chicago style, etc

A standard double-spaced page contains 275 words

Free Features
  • Hiring a preferred expert
  • Bibliography & cover page
  • Revisions within 14-30 days
  • 24/7 customer support
payments

Team of Professional Essay Writers

With our essay service, you'll find an essay writer for any task. Their rating is based on previous customer reviews and successful orders. Before you hire a writer, you can familiarize yourself with their track record in detail.